DONE!!

It's hard to believe that I have waited three long months to write this entry! It's done...Finally! I would be remiss if I didn't "THANK" Travis Holloway of Travco Remodeling, for his amazing work and dedication. We couldn't have asked for better results.


Sherwin Williams: SW 7604 Smoky Blue/ cool/neutral


Pictures just don't do it justice! What was done:

1. Complete replacement of siding and insulation on back additions
2. Clapboard and trim replaced throughout
3. New insulation
4. Replaced outdoor lighting
5. All trim and dental molding painted white
6. New wood pillars, shutters and mailbox
7. Repaired front flower box
8. Replaced all damaged storm windows
9. Replaced front entrance trim
10. Painted inner entrance blue

Lessons Learned:

1. Extensively research material costs even if you don't think you'll be replacing them. I ended up replacing far more than I expected and pricing as I went along. I would have liked to have been better prepared.

2. Ask about material warranties and request the documentation. Lumber yards will boast about lifetime warranties on materials, but are unwilling or unable to tell you exactly what that means. Call the manufacturers and get the details. Ask what their definition of "lifetime" is, and what you should do if the materials don't live up to their warranty. This should also be done with the paint.

3. Communicate your expectations and your understanding of the project with your contractor.

4. Keep a case of wine or beer handy for both you and your contractor!